Knots & Hitches

Bowline with Yosemite Finish

Tie-in knots
Core
tie-in
fixed loop
anchor

Secure fixed loop for tie-in and anchor points, finished by tracing the tail back through the knot body.

When to use it

Tying your climbing line to a hardware point or forming a tie-in eye.

Interactive knot view

Build the Bowline with Yosemite Finish

Working end in orange

Step 1

Form a small loop in the standing part, leaving a long working tail.

Step by step

  1. Step 1

    Form a small loop in the standing part, leaving a long working tail.

  2. Step 2

    Pass the working end up through the loop, around behind the standing part and back down through the loop.

  3. Step 3

    Snug the knot leaving a tail about ten times the rope diameter.

  4. Step 4

    Trace the tail back down alongside the loop leg and through the knot body — the Yosemite finish.

  5. Step 5

    Dress and set both parts firmly, then load-test before use.

Cautions

  • A plain bowline can capsize when cycled loose — always add the Yosemite finish or a stopper.
  • Never leave a short tail. Check it after every descent.

Training aid only. Follow ANSI Z133, your employer's policy and the manufacturer's instructions for every piece of equipment.